Skip to content
PM Surya Ghar • Tamil Nadu • 2026

MNRE solar subsidy in Tamil Nadu, explained step by step

Exact PM Surya Ghar application steps, document checklist, where to file claims and how SVN Renewable handles the whole TANGEDCO net-metering process for you.

How much subsidy you get in Tamil Nadu

The Ministry of New and Renewable Energy funds rooftop solar for homes through the PM Surya Ghar: Muft Bijli Yojana. In Tamil Nadu the scheme runs through TANGEDCO, and the central subsidy amount depends only on system size.

1 kW

₹30,000

2 kW

₹60,000

3 kW & above

₹78,000

Apartments & housing societies

₹18,000 / kW

For group housing societies and RWAs on common utility loads such as lifts, pumps and lighting.

Commercial & industrial

Up to 40% depreciation

Accelerated depreciation tax benefit in year one for businesses, factories and institutions.

Bank loan available

Up to 10-year tenure

Solar loans through leading PSU and private banks at competitive rates — we help with the full documentation.

Zero down payment

₹0 upfront

Start with nothing upfront and pay the EMI from the savings on your electricity bill.

Exact PM Surya Ghar application steps in Tamil Nadu

  1. 1

    Register on the National Portal

    Visit pmsuryaghar.gov.in, select Tamil Nadu as your state and TANGEDCO as your discom. Enter your service connection number, consumer name and mobile number to create the application.

  2. 2

    Apply for feasibility approval

    TANGEDCO checks your sanctioned load, transformer capacity and whether your roof is technically feasible. This approval is usually issued within a few working days.

  3. 3

    Choose a registered vendor

    SVN Renewable Energy is MNRE empanelled and registered on the portal. Once you select us, your application is mapped to our vendor ID and we take over the technical design.

  4. 4

    Install with ALMM-listed modules

    Subsidy requires MNRE-approved (ALMM-listed) solar panels and BIS-certified inverters. We supply only eligible equipment and upload the invoices and warranties to the portal.

  5. 5

    Apply for TANGEDCO net metering

    We submit the net-metering application at your local TANGEDCO section office along with the single-line diagram, roof sketch and vendor documents. TANGEDCO inspects and installs the bidirectional meter.

  6. 6

    Upload commissioning certificate & bank details

    After the net meter is installed, we upload the commissioning certificate on the national portal and enter your bank account for the direct benefit transfer. The subsidy is credited within 30–45 days.

Document checklist for subsidy filing

Keep these ready before the site survey so we can register your application without delay.

  • Aadhaar card of the consumer

    Required

  • Latest TANGEDCO bill with service connection number

    Required

  • Proof of roof ownership or owner consent letter

    Required

  • Cancelled cheque / bank passbook first page

    Required

  • Passport-size photograph

    Required

  • Mobile number linked for portal OTPs

    Required

  • NOC from housing society / RWA (if applicable)

    If applicable

Where we file subsidy claims in Tamil Nadu

Our team works out of Nochiyam, Trichy, and handles PM Surya Ghar registration, vendor mapping and TANGEDCO follow-up in person across central and southern Tamil Nadu.

  • Tiruchirappalli
  • Perambalur
  • Ariyalur
  • Pudukkottai
  • Karur
  • Thanjavur
  • Namakkal
  • Salem
  • Dindigul
  • Madurai
  • Tirunelveli

TANGEDCO offices we coordinate with

  • Tiruchirappalli

    TANGEDCO Trichy Metro / Rural Section Office

  • Srirangam

    TANGEDCO Srirangam Section Office

  • Thuraiyur

    TANGEDCO Thuraiyur Section Office

  • Manapparai

    TANGEDCO Manapparai Section Office

  • Lalgudi

    TANGEDCO Lalgudi Section Office

  • Musiri

    TANGEDCO Musiri Section Office

We submit the net-metering application at the correct section office based on your service connection address, then follow up until the bidirectional meter is installed.

Free subsidy eligibility check

Send your TANGEDCO consumer details and we'll confirm your eligible subsidy, net system cost and next steps.

No spam. Your details are used only to prepare your solar proposal.

Official references

Subsidy rates are set by MNRE and can change; we confirm the current amount in your written quote.

Subsidy questions we get every week

Installing in Tiruchirappalli? See our solar installation in Trichy page, or estimate your bill savings with the solar calculator.

Let SVN Renewable handle your subsidy paperwork

Registration, vendor mapping, inspection and claim filing — done for you, from survey to subsidy credit.