MNRE solar subsidy in Tamil Nadu, explained step by step
Exact PM Surya Ghar application steps, document checklist, where to file claims and how SVN Renewable handles the whole TANGEDCO net-metering process for you.
How much subsidy you get in Tamil Nadu
The Ministry of New and Renewable Energy funds rooftop solar for homes through the PM Surya Ghar: Muft Bijli Yojana. In Tamil Nadu the scheme runs through TANGEDCO, and the central subsidy amount depends only on system size.
1 kW
₹30,000
2 kW
₹60,000
3 kW & above
₹78,000
Apartments & housing societies
₹18,000 / kW
For group housing societies and RWAs on common utility loads such as lifts, pumps and lighting.
Commercial & industrial
Up to 40% depreciation
Accelerated depreciation tax benefit in year one for businesses, factories and institutions.
Bank loan available
Up to 10-year tenure
Solar loans through leading PSU and private banks at competitive rates — we help with the full documentation.
Zero down payment
₹0 upfront
Start with nothing upfront and pay the EMI from the savings on your electricity bill.
Exact PM Surya Ghar application steps in Tamil Nadu
- 1
Register on the National Portal
Visit pmsuryaghar.gov.in, select Tamil Nadu as your state and TANGEDCO as your discom. Enter your service connection number, consumer name and mobile number to create the application.
- 2
Apply for feasibility approval
TANGEDCO checks your sanctioned load, transformer capacity and whether your roof is technically feasible. This approval is usually issued within a few working days.
- 3
Choose a registered vendor
SVN Renewable Energy is MNRE empanelled and registered on the portal. Once you select us, your application is mapped to our vendor ID and we take over the technical design.
- 4
Install with ALMM-listed modules
Subsidy requires MNRE-approved (ALMM-listed) solar panels and BIS-certified inverters. We supply only eligible equipment and upload the invoices and warranties to the portal.
- 5
Apply for TANGEDCO net metering
We submit the net-metering application at your local TANGEDCO section office along with the single-line diagram, roof sketch and vendor documents. TANGEDCO inspects and installs the bidirectional meter.
- 6
Upload commissioning certificate & bank details
After the net meter is installed, we upload the commissioning certificate on the national portal and enter your bank account for the direct benefit transfer. The subsidy is credited within 30–45 days.
Document checklist for subsidy filing
Keep these ready before the site survey so we can register your application without delay.
Aadhaar card of the consumer
Required
Latest TANGEDCO bill with service connection number
Required
Proof of roof ownership or owner consent letter
Required
Cancelled cheque / bank passbook first page
Required
Passport-size photograph
Required
Mobile number linked for portal OTPs
Required
NOC from housing society / RWA (if applicable)
If applicable
Where we file subsidy claims in Tamil Nadu
Our team works out of Nochiyam, Trichy, and handles PM Surya Ghar registration, vendor mapping and TANGEDCO follow-up in person across central and southern Tamil Nadu.
- Tiruchirappalli
- Perambalur
- Ariyalur
- Pudukkottai
- Karur
- Thanjavur
- Namakkal
- Salem
- Dindigul
- Madurai
- Tirunelveli
TANGEDCO offices we coordinate with
- Tiruchirappalli
TANGEDCO Trichy Metro / Rural Section Office
- Srirangam
TANGEDCO Srirangam Section Office
- Thuraiyur
TANGEDCO Thuraiyur Section Office
- Manapparai
TANGEDCO Manapparai Section Office
- Lalgudi
TANGEDCO Lalgudi Section Office
- Musiri
TANGEDCO Musiri Section Office
We submit the net-metering application at the correct section office based on your service connection address, then follow up until the bidirectional meter is installed.
Official references
- PM Surya Ghar National Portal
- Ministry of New & Renewable Energy (MNRE)
- TANGEDCO (Tamil Nadu discom)
- ALMM approved module list
Subsidy rates are set by MNRE and can change; we confirm the current amount in your written quote.
Subsidy questions we get every week
Installing in Tiruchirappalli? See our solar installation in Trichy page, or estimate your bill savings with the solar calculator.
Let SVN Renewable handle your subsidy paperwork
Registration, vendor mapping, inspection and claim filing — done for you, from survey to subsidy credit.