Skip to content
Karur • Tamil Nadu

Solar installation in Karur

Rooftop solar for Karur homes and power-hungry textile and processing units — on-grid, hybrid and zero-export designs, with TNEB approvals handled for you.

Rooftop solar for Karur, Karur district

Karur's textile, bus-body and processing units run heavy daytime loads, which is exactly the profile where commercial rooftop solar pays back fastest — every unit generated replaces a ₹10+ TNEB commercial unit at the time it is consumed.

For units where TANGEDCO net metering is not suitable, we design zero-export systems with an export-control meter so generation is fully self-consumed without feeding the grid.

Central Tamil Nadu averages about 5.5 peak sun hours a day, so 1 kW of well-oriented rooftop solar generates roughly 4.5 units daily — about 135 units a month.

Since 2018 the SVN group has completed 50+ solar projects with 200 kW of installed capacity across Tamil Nadu, from independent houses to commercial units.

  • MNRE empanelled, PM Surya Ghar registered vendor
  • TANGEDCO net-metering paperwork filed for you
  • Tier-1 modules: Adani, Waaree, V-Sole
  • Sungrow / Deye inverters with app monitoring
  • Cyclone-rated galvanised mounting structures
  • Local service team across central Tamil Nadu

Get a Karur rooftop quote

Share your area and last TNEB bill amount — our engineer will call you within one working day.

No spam. Your details are used only to prepare your solar proposal.

How a Karur installation runs

Step 1

Free rooftop survey in Karur

Our engineers visit your roof in Karur — usually within two working days — and measure shadow-free area, roof type, sanctioned load and your last six TNEB bills.

Step 2

System sizing for local conditions

We size around your actual bi-monthly TNEB consumption, not a sales target, and specify structures rated for Karur's heat, dust and monsoon winds.

Step 3

TANGEDCO net metering & subsidy filing

We file the net-metering application at the TANGEDCO section office serving Karur and register the plant on the National Portal for PM Surya Ghar.

Step 4

Installation and commissioning

A typical 3 kW home installation takes two to three days on site — earthing, lightning arrestor, DCDB/ACDB, cabling, inverter commissioning and a walk-through of the monitoring app.

Step 5

After-sales service

Our workshop is in Nochiyam, about 75 km from our Trichy workshop, along the Karur main road, so service calls, panel cleaning and generation checks in Karur are attended quickly.

Areas we cover around Karur

Survey, installation and service across Karur district and neighbouring towns.

  • Karur town
  • Thanthoni
  • Vengamedu
  • Velayuthampalayam
  • Pasupathipalayam
  • Kulithalai
  • Krishnarayapuram
  • Aravakurichi

Based in Trichy? See our Trichy solar installation page.

PM Surya Ghar subsidy in Karur

  • 1 kW₹30,000
  • 2 kW₹60,000
  • 3 kW & above₹78,000

Full eligibility, documents and the application process are explained in our MNRE subsidy guide for Tamil Nadu.

Talk to our team

Our office is about 75 km from our Trichy workshop, along the Karur main road. Call or WhatsApp us to book a free survey in Karur, or drop in to see sample modules, inverters and batteries.

Address

No G2 5/113, Manachanallur Main Road, Nochiyam, Mathavaperumalkovil Village, Trichy – 621216, Tamil Nadu, India

Working hours

Monday – Saturday: 9:00 AM – 7:00 PM | Sunday: By appointment

SVN Renewable Energy

No G2 5/113, Manachanallur Main Road, Nochiyam, Mathavaperumalkovil Village, Trichy – 621216, Tamil Nadu, India

Open in Google Maps →

Frequently asked questions — Karur solar

Local answers on pricing, generation, subsidy and installation timelines.

Get a rooftop solar quote in Karur

Free site survey, honest sizing and a written quote showing subsidy, generation estimate and payback.